Two fence posts can look identical above ground and be completely different where it counts. One has a substantial concrete footing. The other has a skinny concrete shell that barely fits around the wood.
That is the mistake: digging a hole that is too small, then assuming one bag of concrete makes it a properly set fence post. One bag might fill the hole. That does not mean the hole was big enough in the first place.
To show the difference, I set two nominal 4-by-4 wood posts, one in a narrow, one-bag hole and the other in a roughly 12-inch-wide hole using four bags. Then I came back the next day to see how they held up.
We use steel fence posts these days, but wood makes this comparison familiar. And the lesson is straightforward: a good-looking fence starts with work you will never see once the dirt goes back.
Key Takeaways
- A hole barely larger than the post leaves only a thin concrete shell around it.
- Consistent hole width provides room for concrete and allows fence-line adjustments.
- Measure mixing water and follow the concrete bag’s quantity and preparation guidance.
- The next-day comparison exposed cracks in the narrow footing while the larger footing remained intact.
Dig the Hole Your Post Needs, Not Just the Hole Your Diggers Make
For this installation, I was looking for a hole about 12 inches in diameter and at least 30 to 32 inches deep. In an area with deeper frost, you may need to go deeper.
Depth gets plenty of attention. Width is where people start cutting corners.
The opening made by the hand post hole diggers in this comparison measured only about 6⅜ inches by 5 inches, inside to inside. Put a 4-by-4 post in that opening and there is not much space left for concrete.
That is not a footing size. That is simply the size of the tool.
Keep the hole consistent all the way down
A wide opening at the surface does not help much if the hole narrows underneath it. Aim for a cylinder, not an ice cream cone. You need room for concrete along the buried length of the post, not just a nice-looking collar at the top.
- Keep the sides reasonably straight. Do not let the hole taper down to a tight point.
- Measure the depth. Guessing from above is not much of a measuring system.
- Remove loose soil. A power auger can leave plenty of loose dirt in the bottom that still needs to come out.
- Put unwanted dirt straight into a wheelbarrow. There is no prize for moving the same dirt twice.
A larger hole also gives you room to straighten the fence
There is another problem with a tiny hole: adjustment.
If every hole you dig lands perfectly on the fence line, every single time, congratulations. I have not seen that miracle yet.
A hole may land slightly to one side. With a larger hole, you can shift the post into alignment and still leave concrete around it. With a hole barely larger than the wood, you have nowhere to go.
Check the Wood Before You Set It
Wood posts can warp, rot, and twist. They can also have knots in unfortunate places.
On one of these posts, measuring up from the bottom put a knot right near the intended ground line. That is a weak point worth noticing before the post disappears into concrete.
A proper footing does not remove weaknesses in the post itself. Check the material as well as the hole.
Also, decide how much post you actually need above ground. For the 6-foot picket fence arrangement I described, we run the posts to about 66 inches above grade, leaving the pickets 6 inches higher. The post does not have to reach the top of the pickets in that arrangement.
Mix Concrete That Flows Around the Post, Not Concrete Soup
Hole size is the main issue here, but water is another easy way to get the job wrong.
A beginner often starts with a stiff mix, adds water, adds a little more, and suddenly the wheelbarrow is full of something that splashes. Easy to pour? Sure. The mixture you intended to make? No.
Read the water instructions on the bag and measure what you add. A 5-gallon bucket gives you a way to control the quantity. A running garden hose makes it awfully easy to lose track.
There is a difference between workable and watery
The concrete needs enough workability to fill the space around the post. It should not remain a pile of barely damp stone and sand. But it should not have a watery surface that dominates the mixture, either.
I deliberately made an overly wet batch to show the difference. The bag advertised concrete meeting or exceeding 4,000 PSI when prepared as directed. Adding excess water is not a way to get that advertised result.
For the larger footing, I added more dry mix and mixed thoroughly until the batch had a much more workable consistency.
Use a shovel and wheelbarrow, or rent a small concrete mixer if the project warrants it. Post hole diggers are useful for digging holes. Mixing concrete with them is mostly an exercise in making yourself miserable.
Set the Post and Fill the Entire Space Around It
My method here was to put some mixed concrete into the bottom of the hole, push the post into it, and then add the remaining concrete around the sides. We call that initial placement “stabbing” the post.
If the post is reluctant to reach the intended depth, a little turning and wiggling can help it settle into the fresh mix.
- Place some mixed concrete in the hole. Leave enough room to get the post to its intended depth.
- Insert the post. Work it into position and check its height.
- Add concrete around all sides. Fill the hole rather than leaving unfilled pockets beside the wood.
- Work the post slightly while the mix is fresh. In this demonstration, that helped the concrete settle into the surrounding space.
- Check for plumb in both directions. Then recheck after the final adjustments.
The narrow hole took one bag. That was the first one-bag post I had intentionally set in all my fencing work, and not because I had suddenly discovered a better method.
The larger hole took four bags. Read the quantity chart on the back of your concrete bag rather than deciding that one bag per post sounds about right. Bag quantity has to match the hole dimensions and the product’s stated yield.
What about temporary braces?
Neither post needed temporary outriggers to stand during this particular installation. With the workable mix I used, I could still move each post deliberately, but it was not simply falling over when released.
That freedom also let me make adjustments while filling the space around it. A rigidly braced post cannot be worked around the same way.
That is an observation from this setup, not a reason to ignore your product’s instructions. The deliberately watery batch was a different story: a post in that mixture would need support. I also planned to come back and check that the unbraced posts remained plumb as the concrete began to set.
Finishing below grade
My preference is to keep the concrete below grade rather than leave a big exposed mound around the post. On the larger footing, I ended up with slightly more concrete near the surface than I wanted.
I covered the top with soil, tamped around the post, and checked it again. The point during those final adjustments was to avoid leaving a cavity around the wood.
That below-grade finish is my preference in this demonstration. It is separate from the main lesson about footing width, concrete quantity, and mix consistency.
Why the Thickness of the Concrete Matters
Think about a sidewalk. The section I used as an example was only about 3½ inches thick. A sidewalk intended for foot traffic is not the same thing as concrete intended to carry dump trucks or excavators.
Thickness matters to what the concrete can withstand. Nearby, broken and crumbled pavement made that point pretty clearly.
The fence post comparison follows the same basic idea. A thin shell around the wood has much less concrete to resist the forces being applied to the post. If that shell cracks, the post can develop a place to rock.
You can make the post perfectly plumb on installation day and still have an inadequate footing underneath it. Straight today and solid over time are not the same thing.
The Next-Day Test: One Bag Versus Four Bags
After 24 hours, I pushed and rocked both posts by hand.
The post in the small footing showed more movement. Checking them with a level, the larger-footing post was still dead plumb, while the other had shifted toward the edge of the level’s indication.
This was a practical comparison, not a measured wind-load test. The force came from me pushing the posts, not from calibrated equipment.
The narrow concrete shell had cracked
To inspect the smaller footing, I dug beside it, pushed the post toward the opened space, and pulled it out.
The concrete had a visible crack running down its length. Pieces of the thin shell could be pulled away from the post by hand.
The larger footing came out as a solid mass
For a fair inspection, I dug beside the larger footing too. Getting that one out was considerably harder and took help from another person.
Once it was on the ground, I inspected the concrete. I could see a spot where the post hole diggers had hit it, but I did not see fractures like those in the smaller footing. Trying to pull the concrete off the wood by hand did not produce the same result, either.
Both footings were only 24 hours old. The bag used for this comparison specified avoiding undue stress or strain until 24 hours had elapsed, and I waited that interval. That does not mean the concrete had reached its full strength.
What the comparison showed was narrower and useful: at the same age, the small footing had cracked and separated, while the larger footing remained intact under this handling.
One Bag Fits Because the Hole Is Too Small
Is four bags of concrete too much for a fence post? Not for the larger hole in this comparison. It is too much for a little 6-inch hole, which is exactly why that hole only takes one bag.
Do not work backward from the amount of concrete you would like to buy. Start with the footing your installation needs, dig enough room for it, and use the quantity and water guidance supplied with the concrete.
If you want to avoid digging and concrete altogether, a no-dig fence system is another option to consider. But if you are setting posts in concrete, do not confuse filling a small hole with building a substantial footing.
The two posts may look the same above ground. Build the part underneath like it matters, because it does.